Pool & outdoor tiling · Costa del Sol

Pools & terraces, made for summer.

Pool re-tiling in glass mosaic or porcelain, new coping, and terraces in tiles that stay safe underfoot and cope with sun, chlorine and salt air.

  • Glass mosaic (gresite) and porcelain pool finishes
  • Render repairs and waterproofing before tiling
  • Coping, steps and edges finished to match
  • Slip-resistant terrace and pool-surround tiles
Pool & outdoor tiling
Sotogrande pool22 days
Pool & outdoor tiling

What's included.

  • Pool shell prep

    Old tiles removed, render repaired, surfaces prepared.

  • Waterproofing

    A waterproofing system suited to submerged surfaces.

  • Mosaic & tiles

    Glass mosaic or porcelain, with grout suited to pool water.

  • Coping & steps

    Edges, steps and benches finished to match.

  • Terraces

    Slip-resistant, frost- and UV-stable outdoor tiles, with falls to drains.

  • Clean handover

    Grout cured and the site cleaned before the pool is refilled.

How it works

How a pool comes together.

  1. Phase 1

    Drain & strip

    Pool emptied, old finish removed.

  2. Phase 2

    Repair

    Render and cracks repaired, surfaces prepared.

  3. Phase 3

    Waterproof

    System applied and left to cure.

  4. Phase 4

    Tile

    Mosaic or tiles laid, edges and steps finished.

  5. Phase 5

    Cure & fill

    Grout cures fully before refilling.

FAQ

Pools & outdoor · FAQ

How long does a pool re-tile take?

It depends on the size and the state of the shell. Our Sotogrande garden pool took 22 days from strip-out to finish. We'll give you a schedule after the site visit.

When is the best time of year?

Outside the summer season, so the pool is ready when you want to use it. Autumn to spring is ideal on the coast.

Glass mosaic or porcelain?

Glass mosaic is the classic pool finish and handles curves well; porcelain gives a more contemporary look with fewer joints. Our Journal has a full comparison.

Is the site visit really free?

Yes. We come out the same week to look at the pool and the surrounding terrace, with no obligation.

Free site visit

Ready to transform your space?

Tell us about your project. We reply within 24 hours, and a free site visit follows the same week.